Rosebank Substation
Rosebank Substation: Upgrade existing substation to 180MVA firm capacity
Client: City Power
Date: January 2008 to April 2009
Previously, Rosebank Substation consisted of 3 x 45MVA 88/11kV transformers, however, because of the increased demand in the CBD area of Rosebank, and the additional load required for the Gautrain infrastructure, a fourth 45MVA 88/11kV transformer became a necessity, to ensure a firm capacity of 135MVA.
Scope of work completed
Civil Work:
- Demolition work; platform extensions, brickworks and structural erection.
Primary Plant:
- Supply, install and commission 1 x 45MVA 88/11kV transformer.
- Supply, install and commission 11kV x 17 panel feeder board.
- Supply, install and commission 88kV x 1000mm single core XLPE cable between 88kV GIS Panel and transformer 4.
Secondary Plant – Protection and Control:
- Design, supply, install and commission Siprotech numerical relays.
- Supply transformer schemes on separate panel, and feeder protection on MV switchgear.
- SAT and hot commission of Transformer 4; Feeder Board 4 Protection System.
Fire Protection:
- Design, install and commission addressable fire detection system and CO2 gas suppression system.
- Design and install transformer deluge fire prevention system.
Fibre Installation:
- Install Optic Fibre cables ringed from 11kV Feeder Board to the control room for automation communication.